Documentation Creation Criteria
Creation Decision Matrix
| Condition | Required Documents | Creation Order |
|---|---|---|
| New Feature Addition | PRD -> [ADR] -> Design Doc -> Work Plan | After PRD approval |
| ADR Conditions Met (see below) | ADR -> Design Doc -> Work Plan | Start immediately |
| 6+ Files | ADR -> Design Doc -> Work Plan (Required) | Start immediately |
| 3-5 Files | Design Doc -> Work Plan (Recommended) | Start immediately |
| 1-2 Files | None | Direct implementation |
ADR Creation Conditions (Required if Any Apply)
1. Type System Changes
- Adding nested types with 3+ levels:
type A = { b: { c: { d: T } } } - Rationale: Deep nesting has high complexity and wide impact scope
- Changing/deleting types used in 3+ locations
- Rationale: Multiple location impacts require careful consideration
- Type responsibility changes (e.g., DTO->Entity)
- Rationale: Conceptual model changes affect design philosophy
2. Data Flow Changes
- Storage location changes (DB->File, Memory->Cache)
- Processing order changes with 3+ steps
- Example: "Input->Validation->Save" to "Input->Save->Async Validation"
- Data passing method changes (props->Context, direct reference->events)
3. Architecture Changes
- Layer addition, responsibility changes, component relocation
4. External Dependency Changes
- Library/framework/external API introduction or replacement
5. Complex Implementation Logic (Regardless of Scale)
- Managing 3+ states
- Coordinating 5+ asynchronous processes
Detailed Document Definitions
PRD (Product Requirements Document)
Purpose: Define business requirements and user value
Includes: - Business requirements and user value - Success metrics and KPIs (measurable format) - User stories and use cases - MoSCoW prioritization (Must/Should/Could/Won't) - MVP and Future phase separation - User journey diagram (required) - Scope boundary diagram (required)
Excludes: - Technical implementation details (->Design Doc) - Technical selection rationale (->ADR) - Implementation phases (->Work Plan) - Task breakdown (->Work Plan)
ADR (Architecture Decision Record)
Purpose: Record technical decision rationale and background
Includes: - Decision (what was selected) - Rationale (why that selection was made) - Option comparison (minimum 3 options) and trade-offs - Architecture impact - Principled implementation guidelines (e.g., "Use dependency injection")
Excludes: - Implementation schedule, duration (->Work Plan) - Detailed implementation procedures (->Design Doc) - Specific code examples (->Design Doc) - Resource assignments (->Work Plan)
Design Document
Purpose: Define technical implementation methods in detail
Includes: - Existing codebase analysis (required) - Implementation path mapping (both existing and new) - Integration point clarification (connection points with existing code even for new implementations) - Technical implementation approach (vertical/horizontal/hybrid) - Technical dependencies and implementation constraints (required implementation order) - Interface and type definitions - Data flow and component design - E2E verification procedures at integration points - Acceptance criteria (EARS format: When/While/If-then/none) - Change impact map (clearly specify direct impact/indirect impact/no ripple effect) - Complete enumeration of integration points - Data contract clarification - Agreement checklist (agreements with stakeholders) - Prerequisite ADRs (including common ADRs)
Excludes: - Why that technology was chosen (->Reference ADR) - When to implement, duration (->Work Plan) - Who will implement (->Work Plan)
Work Plan
Purpose: Implementation task management and progress tracking
Includes: - Task breakdown and dependencies (maximum 2 levels) - Schedule and duration estimates - Copy E2E verification procedures from Design Doc (cannot delete, can add) - Phase 4 Quality Assurance Phase (required) - Progress records (checkbox format)
Excludes: - Technical rationale (->ADR) - Design details (->Design Doc)
Phase Division Criteria: 1. Phase 1: Foundation Implementation - Type definitions, interfaces, test preparation 2. Phase 2: Core Feature Implementation - Business logic, unit tests 3. Phase 3: Integration Implementation - External connections, presentation layer 4. Phase 4: Quality Assurance (Required) - Acceptance criteria achievement, all tests passing, quality checks
Three Elements of Task Completion Definition: 1. Implementation Complete: Code is functional 2. Quality Complete: Tests, type checks, linting pass 3. Integration Complete: Verified connection with other components
Creation Process
- Problem Analysis: Change scale assessment, ADR condition check
- ADR Option Consideration (ADR only): Compare 3+ options, specify trade-offs
- Creation: Use templates, include measurable conditions
- Approval: "Accepted" after review enables implementation
Storage Locations
| Document | Path | Naming Convention | Template |
|---|---|---|---|
| PRD | docs/prd/ |
[feature-name]-prd.md |
See prd-template.md |
| ADR | docs/adr/ |
ADR-[4-digits]-[title].md |
See adr-template.md |
| Design Doc | docs/design/ |
[feature-name]-design.md |
See design-template.md |
| Work Plan | docs/plans/ |
YYYYMMDD-{type}-{description}.md |
See plan-template.md |
| Task File | docs/plans/tasks/ |
{plan-name}-task-{number}.md |
See task-template.md |
*Note: Work plans are excluded by .gitignore
ADR Status
Proposed -> Accepted -> Deprecated/Superseded/Rejected
AI Automation Rules
- 5+ files: Suggest ADR creation
- Type/data flow change detected: ADR mandatory
- Check existing ADRs before implementation
Diagram Requirements
Required diagrams for each document (using mermaid notation):
| Document | Required Diagrams | Purpose |
|---|---|---|
| PRD | User journey diagram, Scope boundary diagram | Clarify user experience and scope |
| ADR | Option comparison diagram (when needed) | Visualize trade-offs |
| Design Doc | Architecture diagram, Data flow diagram | Understand technical structure |
| Work Plan | Phase structure diagram, Task dependency diagram | Clarify implementation order |
Common ADR Relationships
- At creation: Identify common technical areas (logging, error handling, async processing, etc.), reference existing common ADRs
- When missing: Consider creating necessary common ADRs
- Design Doc: Specify common ADRs in "Prerequisite ADRs" section
- Compliance check: Verify design aligns with common ADR decisions
Templates
Templates are available in the references/ directory:
- Design Document template
- Product Requirements Document template
- Work Plan template
- Architecture Decision Record template
- Task File template